Build - up engineering rush
  • water supply order
  • drainline
  • door - post lighting
  • weak current, build - up telecommunication rush

Build - up communication

  • bituminous
  • concrete
  • from granitic materials- pavings
  • from concrete pavings

 

Reconstruction objects

  • demolition objects
  • assembly plasterboard and below
  • masonry work
  • inner paving and facings
Earthwork
  • hand excavation work
  • mechanical excavation work

 

        Technical equipment companies

        Terrestrial machinery: 3 x UNC 060, 2x DH 112 and 113, 2x KOMATSU WB 93 R
        Transport: 2x LIAZ + HR2500 + tilter, 2x AVIA tilter
        Compressive technology: VD WACKER, rammer WACKER
        Change machinery and tools: motor drunk, lamacky, PERI boarding, aj.

  

     Dornych 118, Brno - phone +420 543 255 282, +420 543 255 283